Earn · fleet throughput

Rough Remotion throughput math for mini fleets.

Using measured LongKinetic3m walls as a planning sketch: an M2 Max-class node finishing in 111.5 s can turn around on the order of ~30 such jobs per hour if fully saturated and thermally stable. Real match rate and pause time will be lower. This is capacity planning, not an earnings invoice.

JobOutputM2 MaxM1 Silver1M1 Silver2CF live
LongKinetic3m3:00 (5400 f)111.5 s133.7 s145.6 s2175.3 s
LongKinetic20m20:00 (36000 f)679.5 s--14502 s PROJECTED

LongKinetic20m CF column is PROJECTED (×20/3 from measured 3-minute CF live). Method: benchmark methodology.

No public $/job. Join the host waitlist and read commercial hosts.

Host waitlist

Early host access updates. Hundreds/month is waitlist positioning, not a live payout guarantee.