Unpaid beta · idle Remotion supply
Idle Macs are Remotion capacity, not watt theater.
Lead with jobs buyers already understand. A 3-minute kinetic in ~2 minutes of Mac wall-clock is the overnight story. Crypto-style watt slogans are the wrong category.
| Job | Output | M2 Max | M1 Silver1 | M1 Silver2 | CF live |
|---|---|---|---|---|---|
| LongKinetic3m | 3:00 (5400 f) | 111.5 s | 133.7 s | 145.6 s | 2175.3 s |
| LongKinetic20m | 20:00 (36000 f) | 679.5 s | - | - | 14502 s PROJECTED |
LongKinetic20m CF column is PROJECTED (×20/3 from measured 3-minute CF live). Method: benchmark methodology.
Power measurement for unpaid tester planning:
| Job | Wall | Abs avg | Abs Wh | Elec @ $0.1883/kWh |
|---|---|---|---|---|
| HeavyMotion | 32.62 s | 33.1 W | 0.287 Wh | ~$0.000054 |
| LongKinetic3m | 111.5 s | 28.6 W | 0.876 Wh | ~$0.000165 |
| LongKinetic20m | 679.5 s | 28.7 W | 5.403 Wh | ~$0.00102 |
M2 Max SoC package samples (ABS, not idle-subtracted). Canonical: power bakeoff.
Volunteer for the unpaid host beta
Host testers volunteer Apple Silicon capacity. No earnings, wages, credits, reimbursements, or payouts accrue.
Join as unpaid host testerOne RenderMac account can use both dashboards. See the unpaid beta terms.