FAQ · methodology

What does PROJECTED mean in our benchmarks?

PROJECTED means we scaled from a measured run instead of finishing that exact cell. Example: CF LongKinetic20m = measured CF LongKinetic3m wall × 20/3. Always prefer MEASURED rows for decisions.

JobOutputM2 MaxM1 Silver1M1 Silver2CF live
LongKinetic3m3:00 (5400 f)111.5 s133.7 s145.6 s2175.3 s
LongKinetic20m20:00 (36000 f)679.5 s--14502 s PROJECTED

LongKinetic20m CF column is PROJECTED (×20/3 from measured 3-minute CF live). Method: benchmark methodology.

Full label guide: methodology.

Join the free buyer beta

Developers and buyers use available beta capacity without charges. Capacity is limited and there is no production SLA.

Create free beta account

One RenderMac account can use both dashboards. See the unpaid beta terms.