Workload · 20-minute Remotion

A 20-minute Remotion kinetic on M2 Max took about 11.3 minutes.

LongKinetic20m (36000 frames) measured 679.5 s on M2 Max. We did not finish a CF live 20-minute run; the CF column below is PROJECTED (×20/3 from measured LongKinetic3m CF live). Read labels carefully.

JobOutputM2 MaxM1 Silver1M1 Silver2CF live
LongKinetic3m3:00 (5400 f)111.5 s133.7 s145.6 s2175.3 s
LongKinetic20m20:00 (36000 f)679.5 s--14502 s PROJECTED

LongKinetic20m CF column is PROJECTED (×20/3 from measured 3-minute CF live). Method: benchmark methodology.

PROJECTED means projected. See methodology. Power for this job was ~5.4 Wh ABS on M2 Max.
JobWallAbs avgAbs WhElec @ $0.1883/kWh
HeavyMotion32.62 s33.1 W0.287 Wh~$0.000054
LongKinetic3m111.5 s28.6 W0.876 Wh~$0.000165
LongKinetic20m679.5 s28.7 W5.403 Wh~$0.00102

M2 Max SoC package samples (ABS, not idle-subtracted). Canonical: power bakeoff.

Buyer waitlist

Early access for Apple Silicon media capacity. Not live public marketplace purchase.