Guide

Remotion cost: Mac power cents vs cloud container rate-card dollars.

For a measured 3-minute kinetic Remotion job, M2 Max package electricity was about ~$0.00017 while Cloudflare Containers standard-1 rate-card math landed near ~$0.0435 for 2175 s of wall (~36 minutes for a 3-minute video). Time is the product cost; Mac electricity is not the buyer floor. RenderMac buyer pricing stays quote-first.

~$0.00017Mac package electricity · Remotion 3 min (ABS)
~$0.0435CF Containers rate-card · same job measured
~$0.29 PROJECTEDCF rate-card · Remotion 20 min
~$0.0010Mac package electricity · Remotion 20 min (ABS)

Cloud compute dollars vs Mac electricity

PathJobWall usedEst. compute $
CF liveLightMotion 5 s54.12 s~$0.00108
CF liveLongKinetic3m2175.3 s measured~$0.0435
CF liveLongKinetic20m14502 s PROJECTED~$0.290 PROJECTED
Mac package electricityLongKinetic3m (ABS Wh)111.5 s~$0.00017
Mac package electricityLongKinetic20m (ABS Wh)679.5 s~$0.00102

CF $ uses published Workers Paid memory/CPU rate-card math (~$0.00002/wall-s upper bound for standard-1). Mac elec = ABS package Wh × $0.1883/kWh. Not an invoice. Not a RenderMac public rate card. Method: benchmark methodology.

What this means for buyers: the expensive part of a tiny-container Remotion path is time-on-box and product latency, not host watt slogans. RenderMac buyer pricing is quote-first. See pricing and Apple Silicon vs cloud containers.

Also read Remotion vs cloud containers, vs Lambda honesty, Remotion rendering, and the interactive Remotion cost calculator.

Join the free buyer beta

Developers and buyers can create an account and use available beta capacity without charges. Capacity is limited and there is no production SLA.

Create free beta account

One RenderMac account can use both dashboards. See the unpaid beta terms.