Guide
Remotion cost: Mac power cents vs cloud container rate-card dollars.
For a measured 3-minute kinetic Remotion job, M2 Max package electricity was about ~$0.00017 while Cloudflare Containers standard-1 rate-card math landed near ~$0.0435 for 2175 s of wall (~36 minutes for a 3-minute video). Time is the product cost; Mac electricity is not the buyer floor. RenderMac buyer pricing stays quote-first.
Cloud compute dollars vs Mac electricity
| Path | Job | Wall used | Est. compute $ |
|---|---|---|---|
| CF live | LightMotion 5 s | 54.12 s | ~$0.00108 |
| CF live | LongKinetic3m | 2175.3 s measured | ~$0.0435 |
| CF live | LongKinetic20m | 14502 s PROJECTED | ~$0.290 PROJECTED |
| Mac package electricity | LongKinetic3m (ABS Wh) | 111.5 s | ~$0.00017 |
| Mac package electricity | LongKinetic20m (ABS Wh) | 679.5 s | ~$0.00102 |
CF $ uses published Workers Paid memory/CPU rate-card math (~$0.00002/wall-s upper bound for standard-1). Mac elec = ABS package Wh × $0.1883/kWh. Not an invoice. Not a RenderMac public rate card. Method: benchmark methodology.
Also read Remotion vs cloud containers, vs Lambda honesty, Remotion rendering, and the interactive Remotion cost calculator.
Join the free buyer beta
Developers and buyers can create an account and use available beta capacity without charges. Capacity is limited and there is no production SLA.
Create free beta accountOne RenderMac account can use both dashboards. See the unpaid beta terms.